Metal Melting, Cupola, Moulding Equipments, Sand Preparation, Core Shop, Metal Handling, Fetting Shop, Sand Plant
:: MELTING ::
• We UNDERTAKE CUPOLA TURNKEY PROJECTS :
( Drag Mouse on Image For Larger View )
Specifications :
Model
KCU-
21
KCU-
24
KCU-2
7
KCU-3
0
KCU-
3
6
KCU-
42
Size (I
DIN INCHES)
21 “
24”
27”
30 “
36 “
42”
MELTING CAP. TON1HR
1.6-2.0
2.4-2.8
2.8-3.2
3.2-3.5
4-4.5
5.8-6.0
BLOWER (HP.)
7.5 Hp
12.5
15
20
25
BLOWER DRIVE
Direct Drive
V-Belt
TEMP. AT SPOUT
1450
0
to 1480
0
+
-
-
METAL CHARGE (KG.)
125
200
250
400
600
CHARGE ABOVE BED COKE
7
6
1
Full Cupola Drum With Foundation Frame
7
CI Touyers Wilh Touyer Covers
2
Top Canopy
8
Blower with Foundation Frame
3
Direct Cupola Charger
9
Blower Air Ducting with Dampers
4
Wet Scrubber (Pollution Co,:,trol Unit)
10
ladle Stand
5
Stack Monitoling Platform For pollutkln Board
11
Tools for Lining
6
Brick Lining Support Rings
12
Pressure Gauge (Manometer Type)
LINING
Double up to Charging Door Single Lining After Charging Door
BRICKS
Fire bricks & Cast Iron Bricks, Up to Melling Zone. IS8"
Other Bricks -1$7, CI Bricks At Charging Door.
PAINT
Heat ResIstant Silver Paint
NOTE
Metal Ratio depends on. Coke Type Used. Scrap SIze. Steel Addition.
Lining/Patching of Cupola & Operating The Cupola.
There is 10% To 12'%> reduction in Batch Type.
Designed by : MID
Hosted by : PBD
Promoted by : GID